The shores of Lake Tanecomo defied the perameter of the Branson Landing. After penetrating the emergency taped stage I found commercial real estate broker Mark Weiss had broken in first.
Weiss said the Landing was engineered with the flooding cycle in mind. One modification was the electric wiring for the elevators. The eastern buildings have wiring at the top of the shafts and the bottom floor of the parking garage was designed for overflow.